[jbosstools-issues] [JBoss JIRA] (JBIDE-24182) wrap staging/release process with pipeline job
Nick Boldt (JIRA)
issues at jboss.org
Fri Mar 31 11:46:00 EDT 2017
Nick Boldt created JBIDE-24182:
----------------------------------
Summary: wrap staging/release process with pipeline job
Key: JBIDE-24182
URL: https://issues.jboss.org/browse/JBIDE-24182
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build
Affects Versions: 4.4.1.AM2
Reporter: Nick Boldt
Assignee: Nick Boldt
Fix For: 4.4.2.Final
Job requires about 13 params:
{code}
version (JBT and JBDS)
versionWithRespin (JBT and JBDS)
versionWithRespin_PREV (JBT and JBDS)
target platforms (min, max, central)
respin # (- or a, b, c)
devsuite installerExe url
stream_JBT=master # or 4.4.neon
stream_DS=master # or 10.0.neon
{code}
See https://github.com/jbdevstudio/jbdevstudio-devdoc/tree/master/release_guide/10 for the steps to convert into a job
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list