[jbosstools-issues] [JBoss JIRA] (JBIDE-24956) CDK: refactor integration tests for use with RedDeer 2.0
Nick Boldt (JIRA)
issues at jboss.org
Tue Sep 12 13:15:00 EDT 2017
[ https://issues.jboss.org/browse/JBIDE-24956?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13462953#comment-13462953 ]
Nick Boldt commented on JBIDE-24956:
------------------------------------
PR is merged. But integration-tests build is still red, because upstream coretests build is red (because of central, which should now be fixed after merging more PRs).
{code}
16:43:02 [ERROR] Missing requirement: org.jboss.tools.central.reddeer 2.1.101.v20170822-1709 requires 'bundle org.jboss.reddeer.go [1.2.0,2.0.0)' but it could not be found
{code}
Respinning coretests here: https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstudio/view/devstudio_master/job/jbosstools-build-sites.aggregate.coretests-site_master/1595/console
> CDK: refactor integration tests for use with RedDeer 2.0
> --------------------------------------------------------
>
> Key: JBIDE-24956
> URL: https://issues.jboss.org/browse/JBIDE-24956
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: cdk, integration-tests
> Affects Versions: 4.5.1.AM1
> Reporter: Ondrej Dockal
> Assignee: Ondrej Dockal
> Fix For: 4.5.1.AM2
>
>
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list