[jbosstools-issues] [JBoss JIRA] (JBIDE-24485) Refactoring: split release job into two pieces so jbosstools and devstudio can run in parallel to save time

Nick Boldt (JIRA) issues at jboss.org
Thu Sep 14 16:27:00 EDT 2017


    [ https://issues.jboss.org/browse/JBIDE-24485?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13464339#comment-13464339 ] 

Nick Boldt edited comment on JBIDE-24485 at 9/14/17 4:26 PM:
-------------------------------------------------------------

Shaved 10 mins off the elapsed time, compared to the 65 mins needed for 4.5.0.* milestone staging.

{code}
jbosstools-releng-push-to-staging-02-copy-builds-and-update-sites_jbt	5 (4.5.1.AM2)
OVERALL TIME	26 MIN
1 core	25-30 mins
2 coretests	20-30 mins
3 ea central	2m25
4 browsersim	56s
5 itests	1m42
6 fuse extras	37s
jbosstools-releng-push-to-staging-02-copy-builds-and-update-sites_ds	5 (11.1.0.AM2)
OVERALL TIME	56 MIN
1 ds installer	55 min
2 ds tp	8m9
3 ea central zips	52s
4 ea central	3m29
5 rpm	4m46
6 fuse extras	30s{code} -- https://docs.google.com/spreadsheets/d/1T-QBqznq_0CySe4bDvIFYrws-FA1HhcS8mgec45aDG8/edit#gid=56330006

Will check publish times for milestone release next week


was (Author: nickboldt):
Shaved 10 mins off the elapsed time, compared to the 65 mins needed for 4.5.0.* milestone staging.

{code}
jbosstools-releng-push-to-staging-02-copy-builds-and-update-sites_jbt	5 (4.5.1.AM2)
OVERALL TIME	26 MIN
1 core	25-30 mins
2 coretests	20-30 mins
3 ea central	2m25
4 browsersim	56s
5 itests	1m42
6 fuse extras	37s
jbosstools-releng-push-to-staging-02-copy-builds-and-update-sites_ds	5 (11.1.0.AM2)
OVERALL TIME	56 MIN
1 ds installer	55 min
2 ds tp	8m9
3 ea central zips	52s
4 ea central	3m29
5 rpm	4m46
6 fuse extras	30s{code}

Will check publish times for milestone release next week

> Refactoring: split release job into two pieces so jbosstools and devstudio can run in parallel to save time
> -----------------------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-24485
>                 URL: https://issues.jboss.org/browse/JBIDE-24485
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: build
>    Affects Versions: 4.5.0.AM1
>            Reporter: Nick Boldt
>            Assignee: Nick Boldt
>              Labels: releasework
>             Fix For: 4.5.1.AM2
>
>
> Should split release job [1] into two pieces so jbosstools and devstudio can run in parallel to save time.
> [1] https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/jbosstools-releng-push-to-dev-stable-02-copy-builds-and-update-sites/



--
This message was sent by Atlassian JIRA
(v7.2.3#72005)


More information about the jbosstools-issues mailing list