[jbosstools-issues] [JBoss JIRA] (JBIDE-24900) Configure cdi.it.smoke to have cdi10/cdi11 axis
Lukáš Valach (JIRA)
issues at jboss.org
Wed Sep 20 03:37:58 EDT 2017
[ https://issues.jboss.org/browse/JBIDE-24900?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Lukáš Valach updated JBIDE-24900:
---------------------------------
Sprint: devex #138 September 2017 (was: devex #137 September 2017)
> Configure cdi.it.smoke to have cdi10/cdi11 axis
> -----------------------------------------------
>
> Key: JBIDE-24900
> URL: https://issues.jboss.org/browse/JBIDE-24900
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests
> Affects Versions: 4.5.1.AM2
> Reporter: Lukáš Valach
> Assignee: Lukáš Valach
> Fix For: 4.5.1.AM3
>
>
> CDI.it.smoke \[1\] takes a long (about 4 hours). We can add cdi10/cdi11 axis to run tests parallely.
> \[1\] https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstudio/view/devstudio_integration_tests/job/cdi.it.smoke
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list