[jbosstools-issues] [JBoss JIRA] (JBDS-3868) Document (and check) required disk space before beginning install

Mohit Suman (JIRA) issues at jboss.org
Mon Sep 25 16:45:00 EDT 2017


    [ https://issues.jboss.org/browse/JBDS-3868?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13468058#comment-13468058 ] 

Mohit Suman edited comment on JBDS-3868 at 9/25/17 4:44 PM:
------------------------------------------------------------

[~crobson]
Based on feedbacks, we have made a new *Confirmation Page* displaying the summary of all the components selected for installation.
* It shows out of the selected components, which of them are already downloaded and which are pending. I have represented them with text and Icon to differentiate.
* The page also shows what will be the downloaded size and install size based on the selection. This helps the user to identify the total space needed for the total download+install.
* The heading _Confirmation Summary_ is fixed upon scrolling, so even if the components increase in future, the tab will have the size summary fixed when scrolled.
* As this is the new page added, the previous confirmation page is renamed to *Selection Page.*

Please let me know if this looks good or any suggestions.

 !confirmation-page.png|thumbnail! 


was (Author: msuman):
[~crobson]
Based on feedbacks, we have made a new *Confirmation Page* displaying the summary of all the components selected for installation.
* It shows out of the selected components, which of them are already downloaded and which are pending. I have represented them with text and Icon to differentiate.
* The page also shows what will be the downloaded size and install size based on the selection. This helps the user to identify the total space needed for the total download+install.
* The heading _Confirmation Summary_ is fixed upon scrolling, so even if the components increase in future, the tab will have the size summary fixed when scrolled.
* As this is the new page added, the previous confirmation page is renamed to* Selection Page.*

Please let me know if this looks good or any suggestions.

 !confirmation-page.png|thumbnail! 

> Document (and check) required disk space before beginning install
> -----------------------------------------------------------------
>
>                 Key: JBDS-3868
>                 URL: https://issues.jboss.org/browse/JBDS-3868
>             Project: Red Hat JBoss Developer Studio (devstudio)
>          Issue Type: Bug
>          Components: platform-installer
>    Affects Versions: 9.1.0.Beta1
>         Environment: Windows 7/64 bit
>            Reporter: Robert Terzi
>            Assignee: Mohit Suman
>            Priority: Minor
>              Labels: ui
>             Fix For: 11.x
>
>         Attachments: confirmation-page.png, screenshot-1.png
>
>
> The installer and it's documentation should indicate the minimum required disk space before beginning the download and installation process. 
> Between temporary files, and download/installs going on in parallel.  I'm guessing at least 10-15 GB free is needed.



--
This message was sent by Atlassian JIRA
(v7.2.3#72005)


More information about the jbosstools-issues mailing list