[jbosstools-issues] [JBoss JIRA] (JBDS-4343) Installation hangs on 'Configuring toolingorg.eclipse.equinox.launcher.*'

Nick Boldt (JIRA) issues at jboss.org
Thu Apr 19 10:17:08 EDT 2018


     [ https://issues.jboss.org/browse/JBDS-4343?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Nick Boldt updated JBDS-4343:
-----------------------------
    Fix Version/s: 12.x
                       (was: 11.x)


> Installation hangs on 'Configuring toolingorg.eclipse.equinox.launcher.*'
> -------------------------------------------------------------------------
>
>                 Key: JBDS-4343
>                 URL: https://issues.jboss.org/browse/JBDS-4343
>             Project: Red Hat JBoss Developer Studio (devstudio)
>          Issue Type: Bug
>          Components: installer
>    Affects Versions: 10.4.0.AM2
>         Environment: devstudio-10.4.0.AM2-v20170330-1543-B348-installer-standalone.jar
>            Reporter: Jan Richter
>            Assignee: Denis Golovin
>              Labels: performance
>             Fix For: 12.x
>
>         Attachments: install.png
>
>
> The installer spends several minutes in this state:
>  !install.png|thumbnail! 
> Just for comparison
>  - AM1 installation takes total of about 2 minutes 15 seconds
>  - AM2 takes 5 minutes 40 seconds
> There is no shortage of memory or disk I/O availability, the CPU is not topped off (even though AM2 eats up more CPU itself during this time).
> DTRACE=true reveals nothing interesting really, this is what it says in the particular moment (notice how much time the operation takes):
> {noformat}
> Configuring toolingorg.eclipse.equinox.launcher.gtk.linux.x86_64
> Preparing to commit the provisioning operation.
> Committing the provisioning operation. 
> Operation completed in 289855 ms.
> {noformat}



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jbosstools-issues mailing list