[jbosstools-issues] [JBoss JIRA] (JBIDE-26333) CDK server adapter: errror while creating Openshift connection after start of CDK 3.6 server adapter

Andre Dietisheim (JIRA) issues at jboss.org
Tue Sep 4 09:09:00 EDT 2018


     [ https://issues.jboss.org/browse/JBIDE-26333?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Andre Dietisheim updated JBIDE-26333:
-------------------------------------
    Steps to Reproduce: 
1. Download latest nightly devstudio 12.9.0.AM3 (B3295)
2. Download cdk 3.6.0 (at the moment CDK v3.6.0-alpha.2-1)
3. Exec: Open devstudio and create cdk 3.2+ server adapter
4. Start CDK server adapter
5. ASSERT: CDK adapter is started, OS connection created, Docker connection created, SSL certificate accepted and no error is shown.
Actual result: Everything is at place and working, though, Error dialog is thrown and error appears in error log.
 !screenshot-1.png|thumbnail! 

  was:
1. Download latest nightly devstudio 12.9.0.AM3 (B3295)
2. Download cdk 3.6.0 (at the moment CDK v3.6.0-alpha.2-1)
3. Exec: Open devstudio and create cdk 3.2+ server adapter
4. Start CDK server adapter
5. ASSERT: CDK adapter is started, OS connection created, Docker connection created, SSL certificate accepted and no error is shown.
Actual result: Everything is at place and working, though, Error dialog is thrown and error appears in error log.



> CDK server adapter: errror while creating Openshift connection after start of CDK 3.6 server adapter
> ----------------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-26333
>                 URL: https://issues.jboss.org/browse/JBIDE-26333
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: cdk, openshift
>    Affects Versions: 4.9.0.AM3
>            Reporter: Ondrej Dockal
>            Assignee: Andre Dietisheim
>              Labels: cdk_server_adapter
>             Fix For: 4.9.0.Final
>
>         Attachments: CDKStartupOSconnError.gif, screenshot-1.png
>
>
> I am watching error being thrown just after cdk server adapter is created and OS untrusted ssl cert. accepted. Also, this throws an Error dialog (making itests to fail). 
> {code}
> null
> org.jboss.tools.openshift.cdk.server
> Error
> Sun Sep 02 20:16:37 CEST 2018
> Error contacting OpenShift
> org.jboss.tools.openshift.internal.cdk.server.core.adapter.OpenShiftNotReadyPollingException: The CDK VM is up and running, but OpenShift is unreachable at url https://192.168.42.235:8443. The VM may not have been registered successfully. Please check your console output for more information
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.MinishiftPoller.checkOpenShiftHealth(MinishiftPoller.java:145)
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.MinishiftPoller.checkOpenShiftHealth(MinishiftPoller.java:124)
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.MinishiftPoller.onePing(MinishiftPoller.java:79)
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.AbstractCDKPoller.onePingSafe(AbstractCDKPoller.java:90)
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.AbstractCDKPoller.getCurrentStateSynchronous(AbstractCDKPoller.java:78)
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.controllers.AbstractCDKLaunchController.handleProcessTerminated(AbstractCDKLaunchController.java:232)
> 	at org.jboss.tools.openshift.internal.cdk.server.core.adapter.controllers.AbstractCDKLaunchController$4.run(AbstractCDKLaunchController.java:188)
> {code}



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jbosstools-issues mailing list