[jbosstools-issues] [JBoss JIRA] (JBIDE-26538) Openshift 3 Server Adapter unusable with 100 projects

Lionel Orellana (Jira) issues at jboss.org
Thu Feb 7 05:44:03 EST 2019


    [ https://issues.jboss.org/browse/JBIDE-26538?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13692320#comment-13692320 ] 

Lionel Orellana edited comment on JBIDE-26538 at 2/7/19 5:43 AM:
-----------------------------------------------------------------

[~adietish] 

* Eclipse Neon + JBoss Tools 4.4.4 -> takes forever to load.
* Elipse 2018-12 (4.10) + Jboss Tools 4.9.0 -> https://issues.jboss.org/browse/JBIDE-26539
* Eclipse 2018-08 (4.9) + Jboss Tools 4.9.0 -> (y)


was (Author: lionelve):
[~adietish] 

* Eclipse Neon + JBoss Tools 4.4.4 -> takes forver to load.
* Elipse 2018-12 (4.10) + Jboss Tools 4.9.0 -> https://issues.jboss.org/browse/JBIDE-26539
* Eclipse 2018-08 (4.9) + Jboss Tools 4.9.0 -> (y)

> Openshift 3 Server Adapter unusable with 100 projects
> -----------------------------------------------------
>
>                 Key: JBIDE-26538
>                 URL: https://issues.jboss.org/browse/JBIDE-26538
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: openshift
>            Reporter: Lionel Orellana
>            Priority: Critical
>              Labels: server_adapter_wizard
>             Fix For: 4.9.0.Final
>
>
> With 100 projects available in the Openshift cluster (3.9) it can take more than an hour to load the Server Adapter wizard while the "Loading projects and services ..." message appears in the progress View.
> Eclipse Neon
> JBoss Tools 4.4.4



--
This message was sent by Atlassian Jira
(v7.12.1#712002)


More information about the jbosstools-issues mailing list