[jbosstools-issues] [JBoss JIRA] (JBIDE-22678) Run integration-test and report results on incoming Pull Request
Josef Kopriva (Jira)
issues at jboss.org
Thu Jul 4 03:34:00 EDT 2019
[ https://issues.jboss.org/browse/JBIDE-22678?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Josef Kopriva closed JBIDE-22678.
---------------------------------
> Run integration-test and report results on incoming Pull Request
> ----------------------------------------------------------------
>
> Key: JBIDE-22678
> URL: https://issues.jboss.org/browse/JBIDE-22678
> Project: Tools (JBoss Tools)
> Issue Type: Enhancement
> Components: build, qa
> Reporter: Mickael Istria
> Assignee: Rastislav Wagner
> Priority: Critical
> Fix For: 4.12.0.Final
>
>
> It would be interesting to have integraton-tests running on incoming Pull Requests.
--
This message was sent by Atlassian Jira
(v7.12.1#712002)
More information about the jbosstools-issues
mailing list