[jbosstools-issues] [JBoss JIRA] (JBIDE-26311) EAP 7.1 fails to stop when connected over ssh

Josef Kopriva (Jira) issues at jboss.org
Fri Mar 29 07:12:01 EDT 2019


    [ https://issues.jboss.org/browse/JBIDE-26311?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13714832#comment-13714832 ] 

Josef Kopriva commented on JBIDE-26311:
---------------------------------------

UPDATE: If I use EAP 7.2 and do deploy before shutting down the server, shutdown works as expected, but If I start server and shutdown right away, then it fails.

> EAP 7.1 fails to stop when connected over ssh
> ---------------------------------------------
>
>                 Key: JBIDE-26311
>                 URL: https://issues.jboss.org/browse/JBIDE-26311
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: server
>    Affects Versions: 4.9.0.AM2
>            Reporter: Martin Malina
>            Assignee: Rob Stryker
>            Priority: Major
>              Labels: regression
>             Fix For: 4.11.x
>
>         Attachments: JBIDE-26311.local.ogv
>
>
> I have an EAP 7.1 setup up over ssh. It's running on my localhost, so it's the most basic test of an ssh server. When I click the stop button on the server, it says:
> Server Red Hat JBoss EAP 7.1 ssh failed to stop.
> An exception stack trace is not available.
> It will stop on second attempt. On a local server this would mean killing the server java process. I'm not sure exactly what happens on a remote server, but it works.
> I'm pretty sure this worked last time (previous milestone).



--
This message was sent by Atlassian Jira
(v7.12.1#712002)


More information about the jbosstools-issues mailing list