[jbossts-issues] [JBoss JIRA] (JBTM-2274) Create separate assumed complete type for heuristic transactions

RH Bugzilla Integration (JIRA) issues at jboss.org
Tue Nov 25 03:28:44 EST 2014


    [ https://issues.jboss.org/browse/JBTM-2274?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13022542#comment-13022542 ] 

RH Bugzilla Integration commented on JBTM-2274:
-----------------------------------------------

Vladimir Dosoudil <dosoudil at redhat.com> changed the Status of [bug 1080140|https://bugzilla.redhat.com/show_bug.cgi?id=1080140] from MODIFIED to ON_QA

> Create separate assumed complete type for heuristic transactions
> ----------------------------------------------------------------
>
>                 Key: JBTM-2274
>                 URL: https://issues.jboss.org/browse/JBTM-2274
>             Project: JBoss Transaction Manager
>          Issue Type: Bug
>          Components: JTS
>            Reporter: Gytis Trikleris
>            Assignee: Gytis Trikleris
>             Fix For: 4.17.24, 5.0.4
>
>
> Currently all JTS transaction records are moved to assumed complete store after 3 recovery tries. This is not good if the transaction has a heuristic outcome. It leads to the heuristic participant being rolled back, because recovery coordinator cannot see the log record after the move.
> Creating separate locations for such heuristic transactions and checking their status during replay_completion would solve the problem.



--
This message was sent by Atlassian JIRA
(v6.3.8#6338)


More information about the jbossts-issues mailing list