[jbpm-dev] [Design of JBoss jBPM] - Re: [BPMN2] How to implement uncontrolled sequence flow beha
kukeltje
do-not-reply at jboss.com
Tue Aug 4 16:59:47 EDT 2009
In gateways it is called from the execute. For the externalActivities it is or better will be called from the signal in the activity(experimenting with that locally). Have to do some refactoring/simplification of the leave. It is now to big a method for different types of nodes.
I think it will work eventually.
View the original post : http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4247975#4247975
Reply to the post : http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&p=4247975
More information about the jbpm-dev
mailing list