[richfaces-issues] [JBoss JIRA] Resolved: (RF-4567) calendar: optionalHeader and optionalFfooter facets don't render {selectedDateControl} element
Pavel Yaschenko (JIRA)
jira-events at lists.jboss.org
Mon Dec 29 10:43:54 EST 2008
[ https://jira.jboss.org/jira/browse/RF-4567?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Pavel Yaschenko resolved RF-4567.
---------------------------------
Resolution: Done
Assignee: Alexander Dubovsky (was: Pavel Yaschenko)
> calendar: optionalHeader and optionalFfooter facets don't render {selectedDateControl} element
> ----------------------------------------------------------------------------------------------
>
> Key: RF-4567
> URL: https://jira.jboss.org/jira/browse/RF-4567
> Project: RichFaces
> Issue Type: Bug
> Components: planning_all
> Affects Versions: 3.3.0
> Environment: JBoss 4.2 Server
> Reporter: Tatyana Romanovich
> Assignee: Alexander Dubovsky
> Fix For: 3.3.0
>
> Attachments: message.jsp
>
> Original Estimate: 3 hours
> Remaining Estimate: 3 hours
>
> 1. Create tested page (see attached file) with optionalFooter and optionalHeader facets. They should contain {selectedDateControl} element
> 2. Run application, open tested page, select any date.
> 3. Expand calendar and verify optionalFooter and optionalHeader facets:
> Error: {selectedDateControl} isn't shown.
> 4. Scroll month or year
> 5. Verify optionalFooter and optionalHeader facets:
> Result: {selectedDateControl} is shown.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the richfaces-issues
mailing list