[richfaces-issues] [JBoss JIRA] Assigned: (RF-6866) calendar: dates with rich-calendar-boundary-dates applied works as boundary.
Pavel Yaschenko (JIRA)
jira-events at lists.jboss.org
Tue Apr 21 10:03:36 EDT 2009
[ https://jira.jboss.org/jira/browse/RF-6866?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Pavel Yaschenko reassigned RF-6866:
-----------------------------------
Assignee: Tsikhon Kuprevich (was: Nick Belaevski)
> calendar: dates with rich-calendar-boundary-dates applied works as boundary.
> ----------------------------------------------------------------------------
>
> Key: RF-6866
> URL: https://jira.jboss.org/jira/browse/RF-6866
> Project: RichFaces
> Issue Type: Bug
> Affects Versions: 3.3.1
> Reporter: Ilya Shaikovsky
> Assignee: Tsikhon Kuprevich
> Priority: Minor
>
> I want just style some dates as disabled. So I've used the rich-calendar-boundary-dates class defined for such dates.
> But in this case this cells behaves as boundary on clicks. (them scrolls the calendar)
> I think this behaviour should not be based on this class because I can't reuse the class in this case.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the richfaces-issues
mailing list