[richfaces-issues] [JBoss JIRA] (RF-13054) Indeterminate ProgressBar

Edilmar Alves (JIRA) jira-events at lists.jboss.org
Thu Jun 6 16:10:54 EDT 2013


Edilmar Alves created RF-13054:
----------------------------------

             Summary: Indeterminate ProgressBar
                 Key: RF-13054
                 URL: https://issues.jboss.org/browse/RF-13054
             Project: RichFaces
          Issue Type: Feature Request
      Security Level: Public (Everyone can see)
    Affects Versions: 4.3.2
            Reporter: Edilmar Alves


I would like a progress bar with a behaviour like Swing indeterminate JProgressBar (http://docs.oracle.com/javase/tutorial/uiswing/components/progress.html).

Text extracted from link above:

"Sometimes you can't immediately determine the length of a long-running task, or the task might stay stuck at the same state of completion for a long time. You can show work without measurable progress by putting the progress bar in indeterminate mode. A progress bar in indeterminate mode displays animation to indicate that work is occurring. As soon as the progress bar can display more meaningful information, you should switch it back into its default, determinate mode."

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the richfaces-issues mailing list