<div dir="ltr">Hello all, I&#39;m totally new to optaplanner / drools and would like to know if the following is possible within the framework (I&#39;d mostly likely use version 6).<div><br></div><div>I have a VRP where we&#39;d like to consider multiple waste streams simultaneously (i.e. trash, recycling, food waste, and yard waste).  We&#39;d also like to consider a fleet of split bin trucks (capable of collecting 2 streams at a time but with reduced capacity), single bin trucks, or a mixture of split and single bin.</div>

<div><br></div><div>So the model would need to allow for a mixture of vehicle types, for nodes to be visited more than once, and for simultaneous collection to occur in the case of split bin trucks.</div><div><br></div><div>

Does this sound like a feasible problem to implement?  Would you anticipate any major or intractable challenges?</div><div><br></div><div>Thanks for your advice, I hope I get the chance to start using optaplanner!</div><div>

<br></div><div>Colin Sheppard</div><div><br clear="all"><div><br>--<br>Colin Sheppard<br>Research Engineer,<br>Schatz Energy Research Center<br><a href="mailto:colin@humboldt.edu">colin@humboldt.edu</a><br>707.633.8633</div>


</div></div>