[jbossseam-issues] [JBoss JIRA] Created: (JBSEAM-3009) Continuous integration builds/tests have missing or skipped tests
Jay Balunas (JIRA)
jira-events at lists.jboss.org
Mon May 19 16:21:09 EDT 2008
Continuous integration builds/tests have missing or skipped tests
-----------------------------------------------------------------
Key: JBSEAM-3009
URL: http://jira.jboss.com/jira/browse/JBSEAM-3009
Project: Seam
Issue Type: Task
Components: Build
Affects Versions: 2.1.0.A1, 2.0.2.GA
Reporter: Jay Balunas
Assigned To: Jay Balunas
The hudson continuous integration builds are missing or skipping many tests. This is due to assumptions made in paths, and "basedir" usage. There is also some issues with test-output being placed in an incorrect directory because "jvmarg value=" is being used.
If you look at the hudson output you can see either many test skipped, or the total test counts being lower than they should.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the seam-issues
mailing list