[teiid-issues] [JBoss JIRA] (TEIID-4169) Deployment/start sequence issue
Steven Hawkins (JIRA)
issues at jboss.org
Mon Apr 25 18:24:00 EDT 2016
[ https://issues.jboss.org/browse/TEIID-4169?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Steven Hawkins resolved TEIID-4169.
-----------------------------------
Resolution: Done
Updated the logic to use a specific timeout to check where state exists. Also made a small change to the zip filesystem to allow for concurrent in vm deployment (which didn't end up being needed by the unit test).
> Deployment/start sequence issue
> -------------------------------
>
> Key: TEIID-4169
> URL: https://issues.jboss.org/browse/TEIID-4169
> Project: Teiid
> Issue Type: Quality Risk
> Components: Query Engine
> Reporter: Steven Hawkins
> Assignee: Steven Hawkins
> Fix For: 9.0, 8.13.4
>
>
> For embedded the start/deployment sequence can cause a large 5 minute timeout to be hit which can excessively delay vdb deployment.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the teiid-issues
mailing list