[teiid-issues] [JBoss JIRA] (TEIID-5683) Push or use limit information before dependent join processing
Steven Hawkins (Jira)
issues at jboss.org
Mon Mar 11 18:12:00 EDT 2019
Steven Hawkins created TEIID-5683:
-------------------------------------
Summary: Push or use limit information before dependent join processing
Key: TEIID-5683
URL: https://issues.jboss.org/browse/TEIID-5683
Project: Teiid
Issue Type: Enhancement
Components: Query Engine
Reporter: Steven Hawkins
Assignee: Steven Hawkins
Fix For: 12.2
There appear to be some situations (such as a left outer join from TEIID-5680) where the limit could help direct a dependent join, but isn't considered as rule push limit isn't run until later.
--
This message was sent by Atlassian Jira
(v7.12.1#712002)
More information about the teiid-issues
mailing list