[jboss-cvs] JBossAS SVN: r81997 - projects/docs/enterprise/4.3.3/Common_Criteria_Guide/en-US.
jboss-cvs-commits at lists.jboss.org
jboss-cvs-commits at lists.jboss.org
Wed Dec 3 00:45:47 EST 2008
Author: irooskov at redhat.com
Date: 2008-12-03 00:45:47 -0500 (Wed, 03 Dec 2008)
New Revision: 81997
Modified:
projects/docs/enterprise/4.3.3/Common_Criteria_Guide/en-US/Requirements_for_the_Evaluated_Configuration.xml
Log:
updated
Modified: projects/docs/enterprise/4.3.3/Common_Criteria_Guide/en-US/Requirements_for_the_Evaluated_Configuration.xml
===================================================================
--- projects/docs/enterprise/4.3.3/Common_Criteria_Guide/en-US/Requirements_for_the_Evaluated_Configuration.xml 2008-12-03 04:59:25 UTC (rev 81996)
+++ projects/docs/enterprise/4.3.3/Common_Criteria_Guide/en-US/Requirements_for_the_Evaluated_Configuration.xml 2008-12-03 05:45:47 UTC (rev 81997)
@@ -170,7 +170,13 @@
<section id="configuration_requirements">
<title>Configuration Requirements</title>
-
+ <para>
+ This section describes modifications to be made to the production server configuration to comply with common certification requirements. It is recommended that you backup the production configuration prior to making the changes shown in the following subsections. To back up the production configuration execute the following commands:
+ </para>
+<programlisting>
+cd $JBOSS_HOME/server
+cp -pr productiion production.ORIG
+</programlisting>
<section id="configuration_requirements-setup_configuration">
<title>Setup Configuration</title>
<para>The following general configuration steps must be performed to ensure compliance
More information about the jboss-cvs-commits
mailing list