[jboss-dev] M2 planning and timeline
Jason T. Greene
jason.greene at redhat.com
Tue Dec 15 13:17:19 EST 2009
Carlo de Wolf wrote:
> On 12/14/2009 12:03 PM, Ales Justin wrote:
>> Module?
>>
> Module as in JavaEE module. E.g. a deployment unit which might be
> assembled in an EAR containing META-INF/validation.xml (BV 1.0 Final Ch 7).
>
> Injection should then happen in accordance to JavaEE 6 PFD EE 5.16.
> @Resource Validator validator;
> @Resource ValidatorFactory validatorFactory;
> and the associated JNDI names:
> java:comp/Validator
> java:comp/ValidatorFactory
>
> The BV deployer should bind a ValidatorFactory into global JNDI per module.
>
> The setup of JNDI namespaces need to be refactored. First I need to
> expedite RELOADED-9 into trunk. That should be easy now that the name
> server has become a MC bean.
> Second we need to get JNDI namespace deployers, so that java:app,
> java:module and java:comp are basically installed via deployments.
> Third we need to refactor the current EncInjectors to make them more
> generic (and out of ejb3-core) so that they can setup the java:comp
> environment for real. This would probably be a deployer (or part of
> java:comp deployer) with incallbacks.
> Last we need to change all the current JavaEE containers to consume the
> newly created JNDI context.
> And finally create an 'EncInjector' for java:comp/Validator...
>
> Carlo
OK, so how does the forecast look for completion of this by Feb 1? I
would love to add it, but I am just wanting to make sure we can do it.
--
Jason T. Greene
JBoss, a division of Red Hat
More information about the jboss-development
mailing list