[jboss-jira] [JBoss JIRA] (JGRP-1629) RELAY2: Adding RELAY2 to an already connected channel

Karim AMMOUS (JIRA) jira-events at lists.jboss.org
Mon May 6 10:57:53 EDT 2013


     [ https://issues.jboss.org/browse/JGRP-1629?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Karim AMMOUS updated JGRP-1629:
-------------------------------

    Description: 
If we add RELAY2 protocol to the protocol stack of an already connected channel, the functionality of relaying messages is not operational.

Starting the relayer is under condition of a view change and coordinator change

Enclosed an extension to Relay2Test. New test method called testAddRelay2ToAnAlreadyConnectedChannel

  was:
If we add RELAY2 protocol to the protocol stack of an already connected channel, the functionality of relaying messages is not operational.

Starting the relayer is under condition of a view change and coordinator change

Enclosed a extension to Relay2Test. New test method called testAddRelay2ToAnAlreadyConnectedChannel


    
> RELAY2: Adding RELAY2 to an already connected channel
> -----------------------------------------------------
>
>                 Key: JGRP-1629
>                 URL: https://issues.jboss.org/browse/JGRP-1629
>             Project: JGroups
>          Issue Type: Feature Request
>    Affects Versions: 3.2.8
>            Reporter: Karim AMMOUS
>            Assignee: Bela Ban
>         Attachments: Relay2Test.java
>
>
> If we add RELAY2 protocol to the protocol stack of an already connected channel, the functionality of relaying messages is not operational.
> Starting the relayer is under condition of a view change and coordinator change
> Enclosed an extension to Relay2Test. New test method called testAddRelay2ToAnAlreadyConnectedChannel

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the jboss-jira mailing list