[jboss-jira] [JBoss JIRA] (JGRP-1629) RELAY2: Adding RELAY2 to an already connected channel
Karim AMMOUS (JIRA)
jira-events at lists.jboss.org
Mon May 6 10:57:53 EDT 2013
[ https://issues.jboss.org/browse/JGRP-1629?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Karim AMMOUS updated JGRP-1629:
-------------------------------
Description:
If we add RELAY2 protocol to the protocol stack of an already connected channel, the functionality of relaying messages is not operational.
Starting the relayer is under condition of a view change and coordinator change
Enclosed a extension to Relay2Test. New test method called testAddRelay2ToAnAlreadyConnectedChannel
was:
If we add RELAY2 protocol to the protocol stack of an already connected channel, the functionality of relaying messages is not operational.
Starting the relayer is under condition of a view change or coordinator change
Enclosed a extension to Relay2Test. New test method called testAddRelay2ToAnAlreadyConnectedChannel
> RELAY2: Adding RELAY2 to an already connected channel
> -----------------------------------------------------
>
> Key: JGRP-1629
> URL: https://issues.jboss.org/browse/JGRP-1629
> Project: JGroups
> Issue Type: Feature Request
> Affects Versions: 3.2.8
> Reporter: Karim AMMOUS
> Assignee: Bela Ban
> Attachments: Relay2Test.java
>
>
> If we add RELAY2 protocol to the protocol stack of an already connected channel, the functionality of relaying messages is not operational.
> Starting the relayer is under condition of a view change and coordinator change
> Enclosed a extension to Relay2Test. New test method called testAddRelay2ToAnAlreadyConnectedChannel
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list