[jboss-jira] [JBoss JIRA] (SWSQE-90) Remove b24 and b25 from hawkular performace cluster

Filip Brychta (JIRA) issues at jboss.org
Tue Apr 17 08:49:00 EDT 2018


     [ https://issues.jboss.org/browse/SWSQE-90?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Filip Brychta updated SWSQE-90:
-------------------------------
    Priority: Minor  (was: Major)


> Remove b24 and b25 from hawkular performace cluster
> ---------------------------------------------------
>
>                 Key: SWSQE-90
>                 URL: https://issues.jboss.org/browse/SWSQE-90
>             Project: Kiali QE
>          Issue Type: Task
>            Reporter: Filip Brychta
>            Assignee: Filip Brychta
>            Priority: Minor
>
> Those 2 blades are used for hawkular performance testing. We agreed to drop that testing so those can be cleaned.



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jboss-jira mailing list