[jboss-jira] [JBoss JIRA] (SWSQE-90) Remove b24 and b25 from hawkular performace cluster
Filip Brychta (JIRA)
issues at jboss.org
Tue Apr 17 08:49:00 EDT 2018
[ https://issues.jboss.org/browse/SWSQE-90?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Filip Brychta updated SWSQE-90:
-------------------------------
Sprint: (was: Kiali QE Sprint 4)
> Remove b24 and b25 from hawkular performace cluster
> ---------------------------------------------------
>
> Key: SWSQE-90
> URL: https://issues.jboss.org/browse/SWSQE-90
> Project: Kiali QE
> Issue Type: Task
> Reporter: Filip Brychta
> Assignee: Filip Brychta
> Priority: Minor
>
> Those 2 blades are used for hawkular performance testing. We agreed to drop that testing so those can be cleaned.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list