[jboss-jira] [JBoss JIRA] (SWSQE-163) Create sub-tasks ... and move a few discrete sub-tasks from this story to sprint #4
Michael Foley (JIRA)
issues at jboss.org
Tue Apr 17 14:31:00 EDT 2018
[ https://issues.jboss.org/browse/SWSQE-163?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Michael Foley updated SWSQE-163:
--------------------------------
Description:
The modularization of the CI/CD pipeline is a large topic ... epic or user story. The first step is to do task breakdown into more discrete units of work.
[~mmahoney] has a slide or google doc outlining, at a high-level, some thoughts (Matt, please attach your slide to this Jira). Using this document as input, I would like to ask [~gbaufake] to work with [~hhovsepy] to create a set of sub-tasks that represent the planned modularization work in some detail. Each unit of work should be around 1 or 2 days of work, at most. And taken together, these sub-tasks will represent the improvements.
Once the sub-tasks are created:
* move this epic out of sprint 4
* move in the specific tasks that are needed for sprint #4
was:
The modularization of the CI/CD pipeline is a large topic ... epic or user story. The first step is to do task breakdown into more discrete units of work.
[~mmahoney] has a slide or google doc outlining, at a high-level, some thoughts. Using this document as input, I would like to ask [~gbaufake] to work with [~hhovsepy] to create a set of sub-tasks that represent the planned modularization work in some detail. Each unit of work should be around 1 or 2 days of work, at most. And taken together, these sub-tasks will represent the improvements.
Once the sub-tasks are created:
* move this epic out of sprint 4
* move in the specific tasks that are needed for sprint #4
Team: (was: Infrastructure)
> Create sub-tasks ... and move a few discrete sub-tasks from this story to sprint #4
> ------------------------------------------------------------------------------------
>
> Key: SWSQE-163
> URL: https://issues.jboss.org/browse/SWSQE-163
> Project: Kiali QE
> Issue Type: Sub-task
> Reporter: Michael Foley
> Assignee: Guilherme Baufaker Rêgo
>
> The modularization of the CI/CD pipeline is a large topic ... epic or user story. The first step is to do task breakdown into more discrete units of work.
> [~mmahoney] has a slide or google doc outlining, at a high-level, some thoughts (Matt, please attach your slide to this Jira). Using this document as input, I would like to ask [~gbaufake] to work with [~hhovsepy] to create a set of sub-tasks that represent the planned modularization work in some detail. Each unit of work should be around 1 or 2 days of work, at most. And taken together, these sub-tasks will represent the improvements.
> Once the sub-tasks are created:
> * move this epic out of sprint 4
> * move in the specific tasks that are needed for sprint #4
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list