[jboss-jira] [JBoss JIRA] (SWSQE-163) Create sub-tasks ... and move a few discrete sub-tasks from this story to sprint #4

Michael Foley (JIRA) issues at jboss.org
Tue Apr 17 14:33:00 EDT 2018


     [ https://issues.jboss.org/browse/SWSQE-163?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Michael Foley updated SWSQE-163:
--------------------------------
    Description: 
The modularization of the CI/CD pipeline is a large topic ... epic or user story.  The first step is to do task breakdown into more discrete units of work.  

[~mmahoney] has a slide or google doc outlining, at a high-level, some thoughts  (Matt, please attach your slide to this Jira).  Using this document as input,  I would like to ask [~gbaufake] to work with [~hhovsepy]  to create a set of sub-tasks that represent the planned modularization work in some detail.   Each unit of work should be around 1 or 2 days of work, at most.    And taken together, these sub-tasks will represent the improvements.      

Once the sub-tasks are created:
* move this epic out of sprint 4
* move in the specific discrete sub-tasks that are needed for sprint #4

  was:
The modularization of the CI/CD pipeline is a large topic ... epic or user story.  The first step is to do task breakdown into more discrete units of work.  

[~mmahoney] has a slide or google doc outlining, at a high-level, some thoughts  (Matt, please attach your slide to this Jira).  Using this document as input,  I would like to ask [~gbaufake] to work with [~hhovsepy]  to create a set of sub-tasks that represent the planned modularization work in some detail.   Each unit of work should be around 1 or 2 days of work, at most.    And taken together, these sub-tasks will represent the improvements.      

Once the sub-tasks are created:
* move this epic out of sprint 4
* move in the specific tasks that are needed for sprint #4

           Team:   (was: Infrastructure)


> Create sub-tasks  ... and move a few discrete sub-tasks from this story to sprint #4
> ------------------------------------------------------------------------------------
>
>                 Key: SWSQE-163
>                 URL: https://issues.jboss.org/browse/SWSQE-163
>             Project: Kiali QE
>          Issue Type: Sub-task
>            Reporter: Michael Foley
>            Assignee: Guilherme Baufaker Rêgo
>
> The modularization of the CI/CD pipeline is a large topic ... epic or user story.  The first step is to do task breakdown into more discrete units of work.  
> [~mmahoney] has a slide or google doc outlining, at a high-level, some thoughts  (Matt, please attach your slide to this Jira).  Using this document as input,  I would like to ask [~gbaufake] to work with [~hhovsepy]  to create a set of sub-tasks that represent the planned modularization work in some detail.   Each unit of work should be around 1 or 2 days of work, at most.    And taken together, these sub-tasks will represent the improvements.      
> Once the sub-tasks are created:
> * move this epic out of sprint 4
> * move in the specific discrete sub-tasks that are needed for sprint #4



--