[jboss-jira] [JBoss JIRA] (DROOLS-2352) Executable model test coverage: run the optaplanner turtleTests with the executable model turned on and see if it survives the ordeal

Geoffrey De Smet (JIRA) issues at jboss.org
Tue Feb 27 03:10:00 EST 2018


Geoffrey De Smet created DROOLS-2352:
----------------------------------------

             Summary: Executable model test coverage: run the optaplanner turtleTests with the executable model turned on and see if it survives the ordeal
                 Key: DROOLS-2352
                 URL: https://issues.jboss.org/browse/DROOLS-2352
             Project: Drools
          Issue Type: Task
          Components: core engine
            Reporter: Geoffrey De Smet
            Assignee: Mario Fusco


For now, we're looking for a one time test. Later I presume the exe model will be come the default, so these tests would just run?

To run the optaplanner turtle tests, run all tests in optaplanner-examples with the VM parameter `-DrunTurtleTests=true`. They take 48 hours to run.  You can also just run one, for example NurseRosteringSolveAllTurtleTest, but don't forget that VM parameter.

Mario Fusco says you can do this to turn on the executable model:
{code}
kieBuilder.buildAll( ExecutableModelProject.class );
{code}

I presume you 'd need to hack that in `ScoreDirectorFactoryConfig.buildDroolsScoreDirectorFactory()`.



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jboss-jira mailing list