[jboss-jira] [JBoss JIRA] (DROOLS-2352) Executable model test coverage: run the optaplanner turtleTests with the executable model turned on and see if it survives the ordeal
Geoffrey De Smet (JIRA)
issues at jboss.org
Tue Feb 27 03:11:00 EST 2018
[ https://issues.jboss.org/browse/DROOLS-2352?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Geoffrey De Smet reassigned DROOLS-2352:
----------------------------------------
Assignee: (was: Mario Fusco)
> Executable model test coverage: run the optaplanner turtleTests with the executable model turned on and see if it survives the ordeal
> -------------------------------------------------------------------------------------------------------------------------------------
>
> Key: DROOLS-2352
> URL: https://issues.jboss.org/browse/DROOLS-2352
> Project: Drools
> Issue Type: Task
> Components: core engine
> Reporter: Geoffrey De Smet
>
> For now, we're looking for a one time test. Later I presume the exe model will be come the default, so these tests would just run?
> To run the optaplanner turtle tests, run all tests in optaplanner-examples with the VM parameter `-DrunTurtleTests=true`. They take 48 hours to run. You can also just run one, for example NurseRosteringSolveAllTurtleTest, but don't forget that VM parameter.
> Mario Fusco says you can do this to turn on the executable model:
> {code}
> kieBuilder.buildAll( ExecutableModelProject.class );
> {code}
> I presume you 'd need to hack that in `ScoreDirectorFactoryConfig.buildDroolsScoreDirectorFactory()`.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list