[jboss-user] [Installation, Configuration & DEPLOYMENT] - More Than One Ear Deployment
rasa
do-not-reply at jboss.com
Thu Apr 2 01:19:33 EDT 2009
Hi,
I have an application which is running successfully in jboss 3.2.5. As per the new requirment i need to add one more ear file which has a different work flow. Is it possible to deploy two different ear in a single jboss, then how the ds file will work for different database connection ? Which is the best design that i can do with this requirment ?
Please guild me
Thanks and Regards
Rasa.
View the original post : http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4222843#4222843
Reply to the post : http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&p=4222843
More information about the jboss-user
mailing list