[jbosscache-dev] Re: JBC cruise control stuff

Manik Surtani manik at jboss.org
Mon Sep 11 11:20:18 EDT 2006


Hmm, I wonder.  I doubt it though, since CC does nightly check outs  
and runs the test suite rather than whenever a commit is made.  I  
presume this has to do with how long the test suite takes to run (80  
mins at the moment), but I still see a lot of merit in having the CC  
test suite runs triggered by check ins.

QA, is this feasible now, since the JBC test suite is now run on a  
separate server?

Cheers,
--
Manik Surtani

Lead, JBoss Cache
JBoss, a division of Red Hat

Email: manik at jboss.org
Telephone: +44 7786 702 706
MSN: manik at surtani.org
Yahoo/AIM/Skype: maniksurtani


On 11 Sep 2006, at 16:11, Vladimir Blagojevic wrote:

> Hey Manik,
>
> Is there a way to cross reference list of cvs modifications with test
> results? For example, it would be cool if I can browse history of  
> state
> transfer results and detect which modifications caused some of the  
> state
> transfer tests to fail.
>
> Peace,
> Vladimir




More information about the jbosscache-dev mailing list