Robert (Bob) Brodt resolved JBIDE-6839.
---------------------------------------

    Resolution: Done


This is a non-issue. Verified that validation is only done once for each BPEL resource.

> BPEL Validator is called twice for every BPEL resource in a project when editor is saved
> ----------------------------------------------------------------------------------------
>
>                 Key: JBIDE-6839
>                 URL: https://issues.jboss.org/browse/JBIDE-6839
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: bpel
>            Reporter: Robert (Bob) Brodt
>            Assignee: Robert (Bob) Brodt
>            Priority: Minor
>             Fix For: 3.2.1
>
>   Original Estimate: 0 minutes
>  Remaining Estimate: 0 minutes
>
> Need to figure out why the model defines both a org.eclipse.core.resources.builders and a org.eclipse.wst.validation.validator extension point - both of these eventually call the model Builder.validate(). The result is that ALL BPEL files in a project get validated TWICE whenever you save a BPEL editor resource.

--