[jbosstools-issues] [JBoss JIRA] Closed: (JBIDE-6839) BPEL Validator is called twice for every BPEL resource in a project when editor is saved
Robert (Bob) Brodt (JIRA)
jira-events at lists.jboss.org
Mon Apr 11 14:55:33 EDT 2011
[ https://issues.jboss.org/browse/JBIDE-6839?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Robert (Bob) Brodt closed JBIDE-6839.
-------------------------------------
Not an issue
> BPEL Validator is called twice for every BPEL resource in a project when editor is saved
> ----------------------------------------------------------------------------------------
>
> Key: JBIDE-6839
> URL: https://issues.jboss.org/browse/JBIDE-6839
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: bpel
> Reporter: Robert (Bob) Brodt
> Assignee: Robert (Bob) Brodt
> Priority: Minor
> Fix For: 3.2.1
>
> Original Estimate: 0 minutes
> Remaining Estimate: 0 minutes
>
> Need to figure out why the model defines both a org.eclipse.core.resources.builders and a org.eclipse.wst.validation.validator extension point - both of these eventually call the model Builder.validate(). The result is that ALL BPEL files in a project get validated TWICE whenever you save a BPEL editor resource.
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list