Yahor Radtsevich commented on JBIDE-9048:
-----------------------------------------
I do not think the problem is long-running JUnits.
On my workstation it takes about 10 minutes to execute all org.jboss.tools.vpe.* tests and 10 minutes to execute all org.jboss.tools.jsf.vpe.* tests.
More probably is that some VPE tests freeze.
> VPE build + tests takes over 4hrs to run
> ----------------------------------------
>
> Key: JBIDE-9048
> URL: https://issues.jboss.org/browse/JBIDE-9048
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: Visual Page Editor core
> Affects Versions: 3.3.0.M2
> Reporter: Nick Boldt
> Assignee: Yahor Radtsevich
> Fix For: 3.3.0.M3
>
>
> Since May 26 (when I ran this job w/ tests disabled), VPE build takes over 4hrs to run.
> http://hudson.qa.jboss.com/hudson/view/DevStudio/view/DevStudio_Trunk/portlet/dashboard_portlet_24/job/jbosstools-3.3_trunk.component--vpe/buildTimeTrend
> We used to have 219 tests; now we have only 11 (perhaps because they take too long, they timeout and fail).
> Could the long-running integration tests be split out from the short-running junits / bot tests?
> http://devstudio.pad.engineering.redhat.com/4
> Or is a better solution to build & publish in this job, THEN run tests as a downstream job (or downstream job config within the same job, if we don't care about multiplatform testing) ?
--