[jbosstools-issues] [JBoss JIRA] (JBDS-3849) Store downloaded requirements for bundled installer between builds
Nick Boldt (JIRA)
issues at jboss.org
Mon Apr 25 14:40:00 EDT 2016
[ https://issues.jboss.org/browse/JBDS-3849?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13196798#comment-13196798 ]
Nick Boldt commented on JBDS-3849:
----------------------------------
New PR... https://github.com/redhat-developer-tooling/developer-platform-install/pull/158/files?w=1
Problem here is that I can't quite figure out how to make the prefetch task block until all 7 downloads & copies are done.
Need suggestion on where to put the callback, since where I have it doesn't work (packaging happens in parallel WHILE the big downloads are still being downloaded or copied from cache).
> Store downloaded requirements for bundled installer between builds
> ------------------------------------------------------------------
>
> Key: JBDS-3849
> URL: https://issues.jboss.org/browse/JBDS-3849
> Project: Developer Studio (JBoss Developer Studio)
> Issue Type: Enhancement
> Components: platform-installer
> Affects Versions: 10.0.0.Alpha1
> Reporter: Denis Golovin
> Assignee: Nick Boldt
> Labels: havoc
> Fix For: 10.0.0.Alpha1
>
>
> Now build downloads all bundled binaries in every build, because the got wiped out by clean task.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list