[keycloak-dev] All PR's failing
Bruno Oliveira
bruno at abstractj.org
Thu Aug 8 10:40:46 EDT 2019
I believe Hynek's changes help us a lot with the PRs and solves our
problem for now. Yesterday after merging Stan's PR which only touches
into non-Java files, the build from master started to fail for the
cross-dc Job.
Cross DC builds as Authz builds run conditionally against pull-request,
not against master. Here is my suggestion:
1. For these builds that have been consistently failing. We apply the
same conditions that we have for pull-request for master. Into other
words, if I didn't touch into cross-dc stuff, I don't run any tests
related to this when my changes are merged.
2. We have a Daily Job running on Travis against master. Into our
scripts we identify the event using TRAVIS_EVENT_TYPE and if that's a
"cron", we run all the tests: cross-dc, authz and others.
If that makes sense and we have some agreement about this. I can give it
a try.
On 2019-08-05, Marek Posolda wrote:
> On 05. 08. 19 19:13, Stan Silvert wrote:
> > On 8/5/2019 3:43 AM, Hynek Mlnarik wrote:
> > > The PRs are blocked by two issues:
> > > 1) Adapter tests sometimes take too much time: This should be
> > > addressed by (now merged) [1]
> > > 2) OpenShiftTokenReviewEndpointTest being unstable, addressed by [2]
> > >
> > > IIRC, we had issues with Travis caches [3, 4], but if there is time it
> > > might be worth checking whether the issues persist.
> > >
> > > Once [2] is merged, Travis should be stable again for rebased PRs.
> > Do we know when this is going to happen?
>
> PR is approved by Hynek and me, but travis didn't pass for the PR due the
> adapter tests exceed the 50 minutes limit. I am retrying one more time.
>
> I agree with what Bruno's suggested to split adapter tests into more groups.
> Or fix adapter tests to not require realm re-import after each test as that
> take significant amount of time. See [1]. But that will probably require
> some more changes and may be probably few days of work...
>
> [1] https://github.com/keycloak/keycloak/blob/master/testsuite/integration-arquillian/tests/base/src/test/java/org/keycloak/testsuite/adapter/AbstractAdapterTest.java#L124-L128
>
> Marek
>
>
> >
> > > --Hynek
> > >
> > > [1] https://github.com/keycloak/keycloak/pull/6209
> > > [2] https://github.com/keycloak/keycloak/pull/6207
> > > [3] https://issues.jboss.org/browse/KEYCLOAK-5124
> > > [4] https://issues.jboss.org/browse/KEYCLOAK-7285
> > >
> > > On Sat, Aug 3, 2019 at 12:52 PM Bruno Oliveira <bruno at abstractj.org
> > > <mailto:bruno at abstractj.org>> wrote:
> > >
> > > Before answer this e-mail I was doing some experiments and there are
> > > some things that I identified we can do about this.
> > >
> > > 1. Enable cache again on Travis
> > >
> > > That won't fix the issue, but may help
> > >
> > > 2. Split the adapter tests
> > >
> > > I did some test with the following PR:
> > > https://github.com/keycloak/keycloak/pull/6221/files
> > >
> > > Here's the output:
> > > https://travis-ci.org/keycloak/keycloak/builds/567252894
> > >
> > > 3. Review the tests we run on Travis
> > >
> > > I'm not so sure if everything that we have running on Travis today is
> > > really required.
> > >
> > >
> > > For now if others agree on item 2, I can polish my PR and work to
> > > get it merged.
> > >
> > > On 2019-08-02, Stan Silvert wrote:
> > > > The adapter tests are timing out on all new PR's.
> > > >
> > > > Hynek, I'm told that you might be able to help?
> > > >
> > > > Stan
> > > >
> > > > _______________________________________________
> > > > keycloak-dev mailing list
> > > > keycloak-dev at lists.jboss.org <mailto:keycloak-dev at lists.jboss.org>
> > > > https://lists.jboss.org/mailman/listinfo/keycloak-dev
> > >
> > > --
> > >
> > > abstractj
> > >
> > _______________________________________________
> > keycloak-dev mailing list
> > keycloak-dev at lists.jboss.org
> > https://lists.jboss.org/mailman/listinfo/keycloak-dev
>
>
--
abstractj
More information about the keycloak-dev
mailing list