[jboss-dev] Re: AS 5.1 Component Project Schedule

Andrew Lee Rubinger andrew.rubinger at redhat.com
Thu Feb 5 03:26:45 EST 2009


org.jboss.bootstrap:jboss-bootstrap:1.0.0-Beta-1 at least.  Beta because 
we'll be conservative w/ the naming schemes. ;)

This also means the removal of the "bootstrap" module from AS in favor 
of the newer component.

We've been using this to prototype runtimes within EJB3, AS Embedded. 
Currently immature as a component, but was copied out of AS where it's 
been considered stable for years.

S,
ALR

Jason T. Greene wrote:
> Project Leads,
> 
> The next planned AS release is 5.1 Beta which we are targeting for a 
> March release, and a following GA in April (provided no major problems).
> 
> I need to know what versions of your respective components you would 
> like included in this release. These would preferably be of CR or better 
> quality, although a beta release may be OK if you are confident you can 
> get a GA shortly thereafter. It would also be helpful if you could limit 
> the scope of whatever version you are targeting for AS inclusion to be 
> the features that benefit AS.
> 
> Keep in mind that we are transitioning to a frequent release cycle for 
> the AS, so there is no need to rush your project to make this release. 
> The more stable the project releases are, the less time it takes getting 
> the AS ready to release.
> 
> Thanks!
> 

-- 
Andrew Lee Rubinger
Sr. Software Engineer
JBoss, a division of Red Hat, Inc.
http://exitcondition.alrubinger.com