[
https://issues.jboss.org/browse/ISPN-6980?page=com.atlassian.jira.plugin....
]
Alan Field updated ISPN-6980:
-----------------------------
Description:
When switching between sites and especially when the replication between sites it async,
cache operators should be able to sync any changes that haven't been replicated before
taking the site offline.
It also might be useful to be able to do a controlled shutdown of a site that sends all
pending changes to the backup site, and then shuts down the cluster.
was:When switching between sites and especially when the replication between sites it
async, cache operators should be able to sync any changes that haven't been replicated
before taking the site offline.
Provide a manual method to sync sites
-------------------------------------
Key: ISPN-6980
URL:
https://issues.jboss.org/browse/ISPN-6980
Project: Infinispan
Issue Type: Feature Request
Components: Cross-Site Replication
Affects Versions: 9.0.0.Alpha4, 8.2.4.Final
Reporter: Alan Field
When switching between sites and especially when the replication between sites it async,
cache operators should be able to sync any changes that haven't been replicated before
taking the site offline.
It also might be useful to be able to do a controlled shutdown of a site that sends all
pending changes to the backup site, and then shuts down the cluster.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)