[
https://issues.jboss.org/browse/ISPN-2197?page=com.atlassian.jira.plugin....
]
Galder Zamarreño updated ISPN-2197:
-----------------------------------
Fix Version/s: 5.2.0.FINAL
Bugzilla References:
https://bugzilla.redhat.com/show_bug.cgi?id=847711 (was:
https://bugzilla.redhat.com/show_bug.cgi?id=847711)
Assignee: Dan Berindei (was: Manik Surtani)
Cache view instalation takes too long
-------------------------------------
Key: ISPN-2197
URL:
https://issues.jboss.org/browse/ISPN-2197
Project: Infinispan
Issue Type: Bug
Components: State transfer
Reporter: Ondrej Nevelik
Assignee: Dan Berindei
Fix For: 5.2.0.FINAL
ISPN000172: Failed to prepare view CacheView{viewId=14, members=[edg-perf05-63964]} for
cache t, rolling back to view CacheView{viewId=11, members=[edg-perf05-63964]}
java.util.concurrent.ExecutionException: java.lang.IllegalStateException: t: Received
cache view prepare request after the local node has already shut down.
When testing configuration [1] with lots of caches, it takes too long for the caches to
shut down - ~20minutes! See the log [2] for more details.. More specifically we are
calling cacheManager.stop() method and then waiting for the cacheManager.getMembers() to
be <= 0.
The Infinispan used is the one in JDG 6.0.1.ER2.
[1]
https://svn.devel.redhat.com/repos/jboss-qa/load-testing/etc/jdg-60/radar...
[2]
https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/EDG6/view/JDG-RADAR...
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators:
https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see:
http://www.atlassian.com/software/jira