[
https://issues.jboss.org/browse/ISPN-7369?page=com.atlassian.jira.plugin....
]
Pedro Ruivo updated ISPN-7369:
------------------------------
Description: When the TriangleOrderManager was introduced, the putAll() logic must had
been updated as well. When the same primary owner has to update >= 2 backups , it
causes the PutMapCommand to block forever (until timeout). (was: When the
TriangleOrderManager was introduced, the putAll() logic must had been updated as well.
When numOnwer > 2, it causes the PutMapCommand to block forever (until timeout).)
PutMapCommand blocks in backup owner
------------------------------------
Key: ISPN-7369
URL:
https://issues.jboss.org/browse/ISPN-7369
Project: Infinispan
Issue Type: Bug
Components: Core
Reporter: Pedro Ruivo
Assignee: Pedro Ruivo
Priority: Critical
Fix For: 9.0.0.Beta2
When the TriangleOrderManager was introduced, the putAll() logic must had been updated as
well. When the same primary owner has to update >= 2 backups , it causes the
PutMapCommand to block forever (until timeout).
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)