]
Tristan Tarrant updated ISPN-1407:
----------------------------------
Fix Version/s: 12.1.0.Final
(was: 12.0.0.Final)
Server-initiated cluster switch
-------------------------------
Key: ISPN-1407
URL:
https://issues.redhat.com/browse/ISPN-1407
Project: Infinispan
Issue Type: Feature Request
Components: Remote Protocols
Reporter: Sanne Grinovero
Assignee: Tristan Tarrant
Priority: Major
Fix For: 12.1.0.Final
when starting a rolling upgrade it will be needed to upgrade the server_lists with new
entries at the start of the upgrade, and possibly remove some entries when the upgrade is
done
Aside from exposing this operation through the REST endpoint, the CLI should be extended
with a {{migrate cluster clients}} command which will tell all clients connected to the
source cluster to switch to the target cluster.