We've got a lot ofJIRAs with 'Critical' priority that have been inactive
for a long time. I think we should define 'Critical' as roughly "important
enough that we need to work on it soon." At some point if something goes
unaddressed long enough that's a sign that it's not important enough to be
called critical.
I propose doing the following: for any Critical WFLY or WFCORE that was
opened > 12 months ago and hasn't shown signs of activity since the WF 32
release, I'll leave a comment saying I plan to downgrade it to Major unless
the assignee says they plan to deal with it for the WF 34 cycle. And then a
couple weeks later downgrade issues.
Similarly, for issues with Fix Version 33.0.0.Final that have been rolling
from release to release since WF 31 or earlier, when I release 33 I intend
to remove the Fix Version instead of rolling it to 34.
WDYT?