Reduce log level of ""received new control socket for
unrecognized listenerId" message
--------------------------------------------------------------------------------------
Key: JBREM-1165
URL:
https://jira.jboss.org/jira/browse/JBREM-1165
Project: JBoss Remoting
Issue Type: Task
Security Level: Public(Everyone can see)
Affects Versions: 2.2.3.SP1, 2.5.2 (Flounder)
Reporter: Ron Sigal
Assignee: Ron Sigal
Priority: Minor
Fix For: 2.2.3.SP2, 2.5.2.SP1 (Flounder)
This message indicates that, in the process of shutting removing a bisocket callback
connection, the server side has been removed before the client side. Just before it gets
shut down, the
org.jboss.remoting.transport.bisocket.BisocketServerInvoker.ControlMonitorTimerTask has
missed a control connection ping and tries to recreate the control connection. It's
just a timing issue and the log message should be reduced from ERROR to INFO.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: