Hi all,
We released today the EAP BOMs version 6.2.0-redhat-1 with Picketlink 2.5.1.
Under EAP BOMs we will maintain for now two branches: 6.2.x and 6.1.x
I was wondering that our branch 6.1.x should be fixed with the right EAP
6.1.x version: Picketlink 2.1.6.
Today I talked to Pedro Igor who told me that it seems a not easy job to
have the -with-security BOM for EAP 6.1.x/PL 2.16 for many reason that
he can explain better than me.
Another approach that I'd like to query everyone is the possibility to
remove -with-security BOM from EAP 6.1.x if it is not possible to have
this BOM working fine for EAP 6.1.x
I expected to hear your comments about the desired/right way to have EAP
6.1.x BOM with -with-security/Picketlink BOM.
Thanks
--
Rafael Benevides | Senior Software Engineer
Red Hat Brazil
+55-61-9269-6576
Better technology. Faster innovation. Powered by community collaboration.
See how it works at
redhat.com