I'll try to have a look at it today.
As a work around you could always use a profile.
On 02/19/2015 01:59 AM, Thomas Segismont wrote:
Hi,
Recently I've sent a pull request[1] so that the Wildfly Maven plugin
can skip start and shutdown.
In RHQ and Hawkular metrics projects, we use the Wildfly Maven plugin to
start a server and deploy an application for integration testing.
To sum up, we attach the following goals to different build phases:
* pre-integration-test -> start
* pre-integration-test -> deploy
* post-integration-test -> shutdown
The deploy goal has a skip parameter[2]. But the start and shutdown
goals haven't. So when we disable tests, we can skip the deploy phase
but Maven will still start and stop the Wildfly server.
I've tested a local build of the plugin with the changes. On the
Hawkular metrics rest-tests module, build time goes from 15 seconds down
to 5 seconds when start and stop goal are skipped.
Can somebody please have a look at the PR?
Thanks,
Thomas
[1]
https://github.com/wildfly/wildfly-maven-plugin/issues/26
[2]
https://docs.jboss.org/wildfly/plugins/maven/latest/deploy-mojo.html#skip
_______________________________________________
wildfly-dev mailing list
wildfly-dev(a)lists.jboss.org
https://lists.jboss.org/mailman/listinfo/wildfly-dev
--
James R. Perkins
JBoss by Red Hat