]
Koen Aers resolved JBIDE-1529.
------------------------------
Resolution: Done
This issue is by design. The task properties are edited in the properties view and not
through right-clicking anymore.
In GPD - right-click on a task node does not display options to add
actions or tasks
------------------------------------------------------------------------------------
Key: JBIDE-1529
URL:
https://jira.jboss.org/jira/browse/JBIDE-1529
Project: Tools (JBoss Tools)
Issue Type: Feature Request
Components: jbpm
Environment: Red Hat Developer Studio - Build id: 1.0.0.CR1
Designer plugin 3.1.0.sp1
jbpm-jpdl-suite-3.2.2 (for jBPM runtime)
Reporter: Len DiMaggio
Assignee: Koen Aers
Fix For: LATER
Attachments: GPD.png, Screenshot_eclipse.png, Screenshot_RHDS.png
Description of problem:
In the GPD, right-clicking on a task does not display options to add actions or tasks in
RHDS CR1.
Contrast - this does work correctly with:
Core and Designer plugin 3.0.13
jbpm-jpdl-suite-3.2.2 (for runtime)
Eclipse Europa - Version: 3.3.1.1
Version-Release number of selected component (IR or RC #, component ver)
Red Hat Developer Studio - Build id: 1.0.0.CR1
How reproducible:
100%
Steps to Reproduce:
1. Access the websale example program - shipped with jbpm-jpdl-suite-3.2.2
2. Edit the processdefinition.xml file with the GPD
3. Right-click on a task node
Actual results:
See RHDS screenshot - attached
Expected results:
See Eclipse screenshot - attached
Additional info: (e.g., stack trace)
Attachments (e.g., server log)
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: