M5 spin status :: no aggregate or JBDS installers available yet; many bot and non-UI test failures, plus one inter-build compilation failure
by Nick Boldt
Since turning on the stable branch jobs, here's what's borked...
https://issues.jboss.org/browse/JBIDE-10349
Still trying to get a clean stable_branch aggregate build (and then JBT
builds too) - last time the aggregate failed due to missing Central,
OTDT, and OpenShift (hadn't spun clean yet).
---
Details:
- hibernate : test failure in org.hibernate.eclipse.console.test
- jbpm : test failure in org.jboss.tools.jbpm.convert.test
- jsf : test failure in org.jboss.tools.jsf.vpe.jsf.test
- maven : 15 bot test failures (same failures in trunk) ... should these
just be turned off and only run locally / manually?
- struts : COMPILE FAILED - upstream bits missing? "The import
org.jboss.tools.jst.web.validation cannot be resolved."
---
There are also a few jobs for which the latest build failed, but at
least we have one good build since branching. This suggests we're having
some stability issues w/ a few Jenkins slaves, but at least we're
getting clean spins when the server is quiet(er).
= archives : aborted build? [Dec 4 ok]
= birt : failed to find usage bits (poor timing between builds) [Dec 4 ok]
= seam : no more locks failure [Dec 4 ok]
--
Nick Boldt :: JBoss by Red Hat
Productization Lead :: JBoss Tools & Dev Studio
http://nick.divbyzero.com
2 weeks, 2 days
4.13.0.Final / 12.13.0.GA Code Freeze today
by Stephane Bouchet
Hello,
It's the reminder that JBossTools 4.13.0.Final / CodeReady Studio
12.13.0.GA release in the way.
The TP is now frozen and all repos will be frozen today Wednesday end
of day UTC time.
If you have pending PRs, please check them and make sure they are
merged before the code freeze.
Thank you,
Regards,
--
Stéphane Bouchet
Senior Software Engineer, R&D
Red Hat <https://www.redhat.com/>
<https://www.redhat.com/>
6 years, 4 months
Proposed schedule for JBoss Tools 4.13.0.Final / CodeReady Studio 12.13.0.GA
by Jean-Francois Maury
Hello,
please find the proposed schedule dates for JBoss Tools and CodeReady
Studio based on Eclipse 2019-09
*Upstream:*
2019-09.M1 19-Jul-2019
2019-09.M2 9-Aug-2019
2019-06.M3 30-Aug-2019
2019-09.RC1 6-Sep-2019
2019-09.RC2 13-Sep-2019
2019-09 GA 18-Sep-2019
*Sprints:*
12-Jun-2019 2-Jul-2019 168 Nymphea
3-Jul-2019 23-Jul-2019 169
24-Jul-2019 13-Aug-2019 170
14-Aug-2019 3-Sep-2019 171
4-Sep-2019 24-Sep-2019 172 Orchid
25-Sep-2019 15-Oct-2019 173
*Dependencies*
EAP CD 17 GA 25-Jul-2019
EAP 7.3 Beta 26-Aug-2019
Wildfly 18 Beta 4-Sep-2019
Wildfly 18 19-Sep-2019
EAP CD 18 GA 12-Nov-2019
EAP 7.3 GA 21-Jan-2020
So, in chronological order:
devex #168 2-Jul-2019
2019-09.M1 19-Jul-2019
devex #169 23-Jul-2019
EAP CD 17 GA 25-Jul-2019
2019-09.M2 9-Aug-2019
devex #170 13-Aug-2019
EAP 7.3 Beta 26-Aug-2019
2019-06.M3 30-Aug-2019
devex #171 3-Sep-2019
Wildfly 18 Beta 4-Sep-2019
2019-09.RC1 6-Sep-2019
2019-09.RC2 13-Sep-2019
2019-09 GA 18-Sep-2019
Wildfly 18 19-Sep-2019
devex #172 24-Sep-2019
devex #173 15-Oct-2019
So, the proposed schedule could be the following:
17-Sep-2019
4.13.0.AM1 TP Code Freeze (based on 2019-09.RC1)
18-Sep-2019
4.13.0.AM1 Code Freeze
20-Sep-2019
4.13.0.AM1 staged for QE
24-Sep-2019
4.13.0.AM1 released
25-Sep-2019
4.13.0.Final TP Code Freeze (based on 2019-09 GA)
2-Oct-2019
4.13.0.Final Code Freeze
4-Oct-2019
4.13.0.Final staged for QE
11-Oct-2019
12.13.0.GA pushed to stage by RCM
14-Oct-2019
12.13.0.GA pushed to prod by RCM
15-Oct-2019
12.13.0.GA announced
So, the bits will be based on 2019-09 and will support Wildfly 18 and EAP
7.3 Beta (Tech Preview)
WDYT ?
--
Jeff Maury
Manager, DevTools
Red Hat EMEA <https://www.redhat.com>
jmaury(a)redhat.com
@RedHat <https://twitter.com/redhat> Red Hat
<https://www.linkedin.com/company/red-hat> Red Hat
<https://www.facebook.com/RedHatInc>
<https://www.redhat.com>
<https://redhat.com/summit>
6 years, 4 months