[JBoss JIRA] (JBTIS-529) fuse fails to install from jboss central
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBTIS-529?page=com.atlassian.jira.plugin.... ]
Nick Boldt commented on JBTIS-529:
----------------------------------
First, here's what was done on Friday to patch the IS "Alpha2 renamed from Final/GA" jars, and to move stuff out of "supported and back to "earlyaccess":
https://github.com/jbosstools/jbosstools-integration-stack/pull/455
Next, I'll look at verifying we have no conflicting IDs.
> fuse fails to install from jboss central
> ----------------------------------------
>
> Key: JBTIS-529
> URL: https://issues.jboss.org/browse/JBTIS-529
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Reporter: Max Rydahl Andersen
> Assignee: Fred Bricon
> Priority: Blocker
> Labels: respin-b
> Fix For: 4.3.0.Alpha2
>
>
> not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you get the "Fuse Integration Project" despite Fuse is only earlyaccess.
> But even with or without earlyaccess installing via the wizard result in:
> Problems occurred while performing installation: There are no connectors to install
> There are no connectors to install
> /cc [~fbricon] any idea ?
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 5 months
[JBoss JIRA] (JBTIS-529) fuse fails to install from jboss central
by Paul Leacu (JIRA)
[ https://issues.jboss.org/browse/JBTIS-529?page=com.atlassian.jira.plugin.... ]
Paul Leacu commented on JBTIS-529:
----------------------------------
Problem #2 was actually am error in the requiredComponentIds for the Fuse Integration proxy wizard -
- requiredComponentIds="jboss.integration-stack.ea.bundle.fuse">
+ requiredComponentIds="jboss.integration-stack.bundle.fuse">
The jar is patched and it is working okay now. [~fbricon] - please double check. I'll ask [~apodhrad] to add JBoss Central proxy wizard verification to the QE testing.
A PR will be coming shortly.
> fuse fails to install from jboss central
> ----------------------------------------
>
> Key: JBTIS-529
> URL: https://issues.jboss.org/browse/JBTIS-529
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Reporter: Max Rydahl Andersen
> Assignee: Fred Bricon
> Priority: Blocker
> Labels: respin-b
> Fix For: 4.3.0.Alpha2
>
>
> not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you get the "Fuse Integration Project" despite Fuse is only earlyaccess.
> But even with or without earlyaccess installing via the wizard result in:
> Problems occurred while performing installation: There are no connectors to install
> There are no connectors to install
> /cc [~fbricon] any idea ?
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 5 months
[JBoss JIRA] (JBTIS-529) fuse fails to install from jboss central
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBTIS-529?page=com.atlassian.jira.plugin.... ]
Nick Boldt updated JBTIS-529:
-----------------------------
Description:
not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you get the "Fuse Integration Project" despite Fuse is only earlyaccess.
But even with or without earlyaccess installing via the wizard result in:
Problems occurred while performing installation: There are no connectors to install
There are no connectors to install
/cc [~fbricon] any idea ?
was:
not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you get the "Fuse Integraiotn Project" despite Fuse is only earlyaccess.
But even with or without earlyaccess installing via the wizard result in:
Problems occurred while performing installation: There are no connectors to install
There are no connectors to install
/cc [~fbricon] any idea ?
> fuse fails to install from jboss central
> ----------------------------------------
>
> Key: JBTIS-529
> URL: https://issues.jboss.org/browse/JBTIS-529
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Reporter: Max Rydahl Andersen
> Assignee: Fred Bricon
> Priority: Blocker
> Labels: respin-b
> Fix For: 4.3.0.Alpha2
>
>
> not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you get the "Fuse Integration Project" despite Fuse is only earlyaccess.
> But even with or without earlyaccess installing via the wizard result in:
> Problems occurred while performing installation: There are no connectors to install
> There are no connectors to install
> /cc [~fbricon] any idea ?
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 5 months
[JBoss JIRA] (JBIDE-20936) Unable to import Fuse Integration Project from Central when Fuse tooling isn't already installed (can't auto-install Fuse connector)
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-20936?page=com.atlassian.jira.plugi... ]
Nick Boldt updated JBIDE-20936:
-------------------------------
Summary: Unable to import Fuse Integration Project from Central when Fuse tooling isn't already installed (can't auto-install Fuse connector) (was: Unable to import Fuse Integration Project from Central when Fuse toolink isn't installed.)
> Unable to import Fuse Integration Project from Central when Fuse tooling isn't already installed (can't auto-install Fuse connector)
> ------------------------------------------------------------------------------------------------------------------------------------
>
> Key: JBIDE-20936
> URL: https://issues.jboss.org/browse/JBIDE-20936
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: central
> Affects Versions: 4.3.0.Final
> Environment: JBDS 9.0.0
> Reporter: Radim Hopp
> Assignee: Nick Boldt
> Priority: Critical
> Fix For: 4.3.1.Beta1, 4.4.0.Alpha1
>
>
> I'm unable to import Fuse Integration Project from Central, when Fuse tooling isn't installed (but is available in EA).
> This might be split to two issues:
> 1) EA is disabled -> Fuse Integration Project should not appear in Central or at least it should tell user to enable EA to be able to install needed fuse tooling.
> 2) EA is enabled -> After clicking on "Fuse Integration Project" user is prompted to install necessary connectors (The required features to use this wizard need to be installed."). After clicking on "Yes", error occurs:
> {noformat}
> Problems occurred while performing installation: There are no connectors to install
> There are no connectors to install
> {noformat}
> {noformat}
> java.lang.IllegalArgumentException: There are no connectors to install
> at org.jboss.tools.discovery.core.internal.connectors.PrepareInstallProfileJob.run(PrepareInstallProfileJob.java:109)
> at org.eclipse.jface.operation.ModalContext$ModalContextThread.run(ModalContext.java:119)
> {noformat}
> Note: When Fuse tooling is already installed, everything is ok .
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 5 months