[JBoss JIRA] (JBTIS-504) publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
by Paul Leacu (JIRA)
[ https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin.... ]
Paul Leacu updated JBTIS-504:
-----------------------------
Attachment: jbtis-disc-ea.png
jbtis-disc.png
> publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
> -----------------------------------------------------------------------------------
>
> Key: JBTIS-504
> URL: https://issues.jboss.org/browse/JBTIS-504
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Components: distribution
> Affects Versions: 4.3.0.Alpha2
> Reporter: Nick Boldt
> Assignee: Paul Leacu
> Fix For: 4.3.0.Alpha2
>
> Attachments: disc-jbdsis-ea.png, disc-jbdsis.png, disc-jbtis-ea.png, disc-jbtis.png, is-in-dev.png, is-in-dev_JBDS.png, jbtis-disc-ea.png, jbtis-disc.png
>
>
> Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery jars into the JBT/JBDS CR1 site so that the "not available" connectors will be seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months
[JBoss JIRA] (JBTIS-504) publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
by Len DiMaggio (JIRA)
[ https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin.... ]
Len DiMaggio commented on JBTIS-504:
------------------------------------
So, if I understand Paul's suggestion, we'll have a single non-selectable note in place of the warning messages for the first several/many messages informing the user that some selections are only available through early access. That's a much better solution!
> publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
> -----------------------------------------------------------------------------------
>
> Key: JBTIS-504
> URL: https://issues.jboss.org/browse/JBTIS-504
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Components: distribution
> Affects Versions: 4.3.0.Alpha2
> Reporter: Nick Boldt
> Assignee: Paul Leacu
> Fix For: 4.3.0.Alpha2
>
> Attachments: disc-jbdsis-ea.png, disc-jbdsis.png, disc-jbtis-ea.png, disc-jbtis.png, is-in-dev.png, is-in-dev_JBDS.png
>
>
> Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery jars into the JBT/JBDS CR1 site so that the "not available" connectors will be seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months
[JBoss JIRA] (JBTIS-504) publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin.... ]
Nick Boldt commented on JBTIS-504:
----------------------------------
Why not reuse the connector ID from the NA one as the connector ID for the first one that becomes available? Then it should disappear, along with its NA category.
> publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
> -----------------------------------------------------------------------------------
>
> Key: JBTIS-504
> URL: https://issues.jboss.org/browse/JBTIS-504
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Components: distribution
> Affects Versions: 4.3.0.Alpha2
> Reporter: Nick Boldt
> Assignee: Paul Leacu
> Fix For: 4.3.0.Alpha2
>
> Attachments: disc-jbdsis-ea.png, disc-jbdsis.png, disc-jbtis-ea.png, disc-jbtis.png, is-in-dev.png, is-in-dev_JBDS.png
>
>
> Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery jars into the JBT/JBDS CR1 site so that the "not available" connectors will be seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months
[JBoss JIRA] (JBTIS-504) publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
by Alexey Kazakov (JIRA)
[ https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin.... ]
Alexey Kazakov commented on JBTIS-504:
--------------------------------------
JBT looks good to me. JBDS message is a little bit long so it's cut. But anyway. It's much better now.
> publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
> -----------------------------------------------------------------------------------
>
> Key: JBTIS-504
> URL: https://issues.jboss.org/browse/JBTIS-504
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Components: distribution
> Affects Versions: 4.3.0.Alpha2
> Reporter: Nick Boldt
> Assignee: Paul Leacu
> Fix For: 4.3.0.Alpha2
>
> Attachments: disc-jbdsis-ea.png, disc-jbdsis.png, disc-jbtis-ea.png, disc-jbtis.png, is-in-dev.png, is-in-dev_JBDS.png
>
>
> Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery jars into the JBT/JBDS CR1 site so that the "not available" connectors will be seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months
[JBoss JIRA] (JBTIS-504) publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
by Paul Leacu (JIRA)
[ https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin.... ]
Paul Leacu commented on JBTIS-504:
----------------------------------
This proposal attempt to address to issues:
1. The 'not available' Integration Stack connectors are obscuring the real stuff you can install.
2. The original Jira (20100) that said there was no way to know that Fuse Tooling was available from EA when you get to the initial discovery window.
Keeping all of the existing connectors as not available from the release side and pointing them to the 'Enable Early Access' seems redundant and "sucks".
Removing the "not available" connectors from the release side window doesn't solve #2 above.
Max suggested having just one entry for all of the missing EA IS components. This seemed logical to me. Take a look at these attachments and let me know what you think.
!disc-jbdsis.png|thumbnail!
!disc-jbdsis-ea.png|thumbnail!
!disc-jbtis.png|thumbnail!
!disc-jbtis-ea.png|thumbnail!
The obvious issue is that the generic connector stays around after you install the EA components.
> publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
> -----------------------------------------------------------------------------------
>
> Key: JBTIS-504
> URL: https://issues.jboss.org/browse/JBTIS-504
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Components: distribution
> Affects Versions: 4.3.0.Alpha2
> Reporter: Nick Boldt
> Assignee: Paul Leacu
> Fix For: 4.3.0.Alpha2
>
> Attachments: disc-jbdsis-ea.png, disc-jbdsis.png, disc-jbtis-ea.png, disc-jbtis.png, is-in-dev.png, is-in-dev_JBDS.png
>
>
> Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery jars into the JBT/JBDS CR1 site so that the "not available" connectors will be seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months
[JBoss JIRA] (JBTIS-504) publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
by Paul Leacu (JIRA)
[ https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin.... ]
Paul Leacu updated JBTIS-504:
-----------------------------
Attachment: disc-jbdsis.png
disc-jbdsis-ea.png
disc-jbtis-ea.png
disc-jbtis.png
> publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site when available
> -----------------------------------------------------------------------------------
>
> Key: JBTIS-504
> URL: https://issues.jboss.org/browse/JBTIS-504
> Project: JBoss Tools Integration Stack
> Issue Type: Bug
> Components: distribution
> Affects Versions: 4.3.0.Alpha2
> Reporter: Nick Boldt
> Assignee: Paul Leacu
> Fix For: 4.3.0.Alpha2
>
> Attachments: disc-jbdsis-ea.png, disc-jbdsis.png, disc-jbtis-ea.png, disc-jbtis.png, is-in-dev.png, is-in-dev_JBDS.png
>
>
> Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery jars into the JBT/JBDS CR1 site so that the "not available" connectors will be seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months
[JBoss JIRA] (JBIDE-20914) make jbds-dist-diff more user-friendly and scriptable
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-20914?page=com.atlassian.jira.plugi... ]
Nick Boldt commented on JBIDE-20914:
------------------------------------
{code}
$➔ ./jbds-dist-diff.sh ~/tmp/jboss-devstudio-9.0.0.CR2-v20150925-1252-B116-installer-standalone.jar ~/tmp/jboss-devstudio-9.0.0.GA-v20151002-2235-B124-installer-standalone.jar
[INFO] Install /home/nboldt/tmp/jboss-devstudio-9.0.0.CR2-v20150925-1252-B116-installer-standalone.jar into /tmp/tmp.bStU70UhlX/jboss-devstudio-9.0.0.CR2-v20150925-1252-B116-installer-standalone
real 1m57.235s
user 2m37.254s
sys 0m26.206s
[INFO] Installed in /tmp/tmp.bStU70UhlX/jboss-devstudio-9.0.0.CR2-v20150925-1252-B116-installer-standalone
[INFO] Install /home/nboldt/tmp/jboss-devstudio-9.0.0.GA-v20151002-2235-B124-installer-standalone.jar into /tmp/tmp.bStU70UhlX/jboss-devstudio-9.0.0.GA-v20151002-2235-B124-installer-standalone
real 1m56.286s
user 2m33.083s
sys 0m27.052s
[INFO] Installed in /tmp/tmp.bStU70UhlX/jboss-devstudio-9.0.0.GA-v20151002-2235-B124-installer-standalone
BUILD FAILED
/home/nboldt/truu/jbdevstudio-qa/jbds-dist-diff/diff.xml:10: Unexpected differences were found or expected differences were not found
Total time: 11 seconds
real 0m11.890s
user 0m16.530s
sys 0m2.523s
[INFO] Logs are in /tmp/tmp.bStU70UhlX:
[INFO] * /tmp/tmp.bStU70UhlX/old_dir_file_list.log.txt
[INFO] * /tmp/tmp.bStU70UhlX/new_dir_file_list.log.txt
[INFO] * /tmp/tmp.bStU70UhlX/dist-diff.log.txt
[INFO] * /tmp/tmp.bStU70UhlX/dist-diff-grepped-no-manifests.log.txt
[INFO] * /tmp/tmp.bStU70UhlX/dist-diff-grepped-no-signatures.log.txt
{code}
-- PR: https://github.com/jbdevstudio/jbdevstudio-qa/pull/82
> make jbds-dist-diff more user-friendly and scriptable
> -----------------------------------------------------
>
> Key: JBIDE-20914
> URL: https://issues.jboss.org/browse/JBIDE-20914
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build
> Affects Versions: 4.3.0.CR2, 4.4.0.Alpha1
> Reporter: Nick Boldt
>
> Did some digging into the https://github.com/jbdevstudio/jbdevstudio-qa/tree/master/jbds-dist-diff tool and discovered that its doc is not entirely straightforward.
> Also, it doesn't support headless JBDS installs, so it needs human bootstrapping.
> I propose making it support headless installs so it's more easily scriptable.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
10 years, 6 months