[JBoss JIRA] (JBIDE-24121) Update versionwatch for devstudio 11 - document/update known multiples & report upstream problems to Eclipse CVS, Help, WST
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-24121?page=com.atlassian.jira.plugi... ]
Nick Boldt commented on JBIDE-24121:
------------------------------------
Gave up on ssh mounts. WAY faster to just pull down installer jars and work in local workspace.
So this is still blocked by moving to Oxygen.0.M7 (to fix the known issues in upstream projects) but is otherwise done.
> Update versionwatch for devstudio 11 - document/update known multiples & report upstream problems to Eclipse CVS, Help, WST
> ---------------------------------------------------------------------------------------------------------------------------
>
> Key: JBIDE-24121
> URL: https://issues.jboss.org/browse/JBIDE-24121
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build, qa, versionwatch
> Affects Versions: 4.5.0.AM1
> Reporter: Nick Boldt
> Assignee: Nick Boldt
> Fix For: 4.5.0.AM1
>
> Attachments: Screenshot_2017-03-21_12-37-07.png, version-decreased.png
>
>
> {code}
> Version Watch - Summary Report: devstudio-11.0.0.AM1
> Multiple version issues
> Feature Problem Reference Version(s)
> Plugin Problem Reference Version(s)
> org.slf4j.api Multiple versions of same bundle found! 1.7.2.v20121108-1250 1.7.10.v20160921-1923
> org.apache.httpcomponents.httpcore Multiple versions of same bundle found! 4.3.3.v201411290715 4.4.4.v20161115-1643
> org.apache.httpcomponents.httpclient Multiple versions of same bundle found! 4.3.6.v201511171540 4.5.2.v20161115-1643
> Ignored (known issue)
> org.apache.lucene.core Multiple versions of bundle are expected and ignored - {3.5.0,5.4.1} 3.5.0.v20120725-1805 6.1.0.v20161115-1612
> javax.wsdl Multiple versions of bundle are expected and ignored - {1.5.1,1.6.2} 1.5.1.v201012040544 1.6.2.v201012040545
> com.jcraft.jsch Multiple versions of bundle are expected and ignored - {0.1.50,0.1.51} 0.1.53.v201508180515 0.1.54.v20170116-1932
> org.eclipse.jdt.annotation Multiple versions of bundle are expected and ignored - {1.1.0,2.1.0} 1.1.100.v20160418-1457 2.1.0.v20170119-1701
> org.objectweb.asm Multiple versions of bundle are expected and ignored - {4.0.0,5.0.1} 4.0.0.v201302062210 5.0.1.v201404251740
> org.apache.commons.logging Multiple versions of bundle are expected and ignored - {1.0.4,1.1.1} 1.0.4.v201101211617 1.1.1.v201101211721
> com.google.guava Multiple versions of bundle are expected and ignored - 13.0.0,15.0.0 15.0.0.v201403281430 18.0.0.v20161115-1643
> Version decreased issues
> Feature Problem Reference Version(s)
> org.eclipse.cvs Version 1.4.300.v20170126-1030 must be higher than 1.4.301.v20161124-1400 1.4.301.v20161124-1400
> org.eclipse.help Version 2.2.0.v20170126-1030 must be higher than 2.2.1.v20161124-1400 2.2.1.v20161124-1400
> Plugin Problem Reference Version(s)
> org.eclipse.cvs Version 1.4.300.v20170126-1030 must be higher than 1.4.301.v20161124-1400 1.4.301.v20161124-1400
> org.eclipse.wst.server.ui Version 1.5.306.v201610202117 must be higher than 1.5.307.v201611072017 1.5.307.v201611072017
>
> 7 issues found.{code}
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 10 months
[JBoss JIRA] (JBIDE-23567) Integration tests global refactoring
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-23567?page=com.atlassian.jira.plugi... ]
Nick Boldt edited comment on JBIDE-23567 at 5/16/17 3:53 PM:
-------------------------------------------------------------
25 incomplete subtasks for 4.4.4.Final so slip to 4.5.0.AM1.
Also made sure that all unassigned subtasks have an owner. Fixversions for subtasks also pushed out to 4.5.0.AM1, since there is no 4.4.x.
was (Author: nickboldt):
Incomplete for 4.4.4.Final so slip to 4.5.0.AM1.
Also made sure that all unassigned subtasks have an owner. Fixversions for subtasks also pushed out to 4.5.0.AM1, since there is no 4.4.x.
> Integration tests global refactoring
> ------------------------------------
>
> Key: JBIDE-23567
> URL: https://issues.jboss.org/browse/JBIDE-23567
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests
> Reporter: Jeff MAURY
> Assignee: Jeff MAURY
> Labels: integration-test, integration_tests
> Fix For: 4.5.0.AM1
>
>
> We should done some work on integration tests so that we can rely on them to improve our code quality and reduce the technical debt.
> A sprint will be dedicated.
> Here are the tasks we should work on:
> * run tests from Maven and document how to run them if specific steps are required
> * If failure, fix the failed tests
> * Refactor / move tests to the components repository
> * Fix/make sure tests are run in PR check
> This huge task should be done component per component. Sub-tasks JIRA will be created for each component.
> You can use this document as a starting point:[https://docs.google.com/document/d/1bl8pJ2aW65UpyGpr3qxoAUREDWL26N...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 10 months
[JBoss JIRA] (JBIDE-23567) Integration tests global refactoring
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-23567?page=com.atlassian.jira.plugi... ]
Nick Boldt updated JBIDE-23567:
-------------------------------
Sprint: devex #124 December 2017, devex #132 May 2017 (was: devex #124 December 2017)
> Integration tests global refactoring
> ------------------------------------
>
> Key: JBIDE-23567
> URL: https://issues.jboss.org/browse/JBIDE-23567
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests
> Reporter: Jeff MAURY
> Assignee: Jeff MAURY
> Labels: integration-test, integration_tests
> Fix For: 4.5.0.AM1
>
>
> We should done some work on integration tests so that we can rely on them to improve our code quality and reduce the technical debt.
> A sprint will be dedicated.
> Here are the tasks we should work on:
> * run tests from Maven and document how to run them if specific steps are required
> * If failure, fix the failed tests
> * Refactor / move tests to the components repository
> * Fix/make sure tests are run in PR check
> This huge task should be done component per component. Sub-tasks JIRA will be created for each component.
> You can use this document as a starting point:[https://docs.google.com/document/d/1bl8pJ2aW65UpyGpr3qxoAUREDWL26N...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 10 months
[JBoss JIRA] (JBIDE-23567) Integration tests global refactoring
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-23567?page=com.atlassian.jira.plugi... ]
Nick Boldt edited comment on JBIDE-23567 at 5/16/17 3:52 PM:
-------------------------------------------------------------
Incomplete for 4.4.4.Final so slip to 4.5.0.AM1.
Also made sure that all unassigned subtasks have an owner. Fixversions for subtasks also pushed out to 4.5.0.AM1, since there is no 4.4.x.
was (Author: nickboldt):
Incomplete for 4.4.4.Final so slip to 4.5.0.AM1
> Integration tests global refactoring
> ------------------------------------
>
> Key: JBIDE-23567
> URL: https://issues.jboss.org/browse/JBIDE-23567
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests
> Reporter: Jeff MAURY
> Assignee: Jeff MAURY
> Labels: integration-test, integration_tests
> Fix For: 4.5.0.AM1
>
>
> We should done some work on integration tests so that we can rely on them to improve our code quality and reduce the technical debt.
> A sprint will be dedicated.
> Here are the tasks we should work on:
> * run tests from Maven and document how to run them if specific steps are required
> * If failure, fix the failed tests
> * Refactor / move tests to the components repository
> * Fix/make sure tests are run in PR check
> This huge task should be done component per component. Sub-tasks JIRA will be created for each component.
> You can use this document as a starting point:[https://docs.google.com/document/d/1bl8pJ2aW65UpyGpr3qxoAUREDWL26N...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 10 months
[JBoss JIRA] (JBIDE-23567) Integration tests global refactoring
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-23567?page=com.atlassian.jira.plugi... ]
Nick Boldt commented on JBIDE-23567:
------------------------------------
Incomplete for 4.4.4.Final so slip to 4.5.0.AM1
> Integration tests global refactoring
> ------------------------------------
>
> Key: JBIDE-23567
> URL: https://issues.jboss.org/browse/JBIDE-23567
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests
> Reporter: Jeff MAURY
> Assignee: Jeff MAURY
> Labels: integration-test, integration_tests
> Fix For: 4.5.0.AM1
>
>
> We should done some work on integration tests so that we can rely on them to improve our code quality and reduce the technical debt.
> A sprint will be dedicated.
> Here are the tasks we should work on:
> * run tests from Maven and document how to run them if specific steps are required
> * If failure, fix the failed tests
> * Refactor / move tests to the components repository
> * Fix/make sure tests are run in PR check
> This huge task should be done component per component. Sub-tasks JIRA will be created for each component.
> You can use this document as a starting point:[https://docs.google.com/document/d/1bl8pJ2aW65UpyGpr3qxoAUREDWL26N...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 10 months